Looking good! Should give that snow blower a test run... Ya know...


We have a winter storm warning. The cars are in the driveway because the Ferrari, the lawn equipment and plants are in the attached garage. The snow blower for sure has a couple flat tires, the 4x4 on my bmw is not working because of a failed senior I think and Lana's Mercedes needs tires with tread.....I'm so not ready for winter :(

Author:  mk e [ Wed Nov 14, 2018 11:09 am ]
Post subject:  Re: mk e's Shop remodel

I realized the other day that the construction 1 year anniversary just past....and I'm nothing like finished. :oops:

Author:  mk e [ Thu Nov 15, 2018 9:29 am ]
Post subject:  Re: mk e's Shop remodel

Finished hanging the drywall on the ceiling last night including a little framing around the stairs needed to complete the ceiling. Yay!

Hopefully the walls go quicker.....a little more sqft but should be easier to handle. I expect to be mudding by the end of the weekend. When I was on the stairs framing I noticed the cold breeze from the soffits.....I want to get the downstairs finished enough to move stuff into but I need to seal the upstairs area too, I heard itsx15f below normal today :(

Author:  mk e [ Fri Nov 16, 2018 9:46 am ]
Post subject:  Re: mk e's Shop remodel

Drywall up on the north wall

Attachments:
20181115_195956-resized-1024.jpg
20181115_195956-resized-1024.jpg [ 256.16 KiB | Viewed 6473 times ]

Author:  mk e [ Fri Nov 16, 2018 7:11 pm ]
Post subject:  Re: mk e's Shop remodel

Drywall up on the east wall...just 1 left.

Author:  mk e [ Mon Nov 19, 2018 11:32 am ]
Post subject:  Re: mk e's Shop remodel

Drywall finished on main floor. I didn't get any mud on though.....and I'm thinking as much as I want to do the mud and finish the main floor I probably need to move upstairs and get that sealed or it will not stay warm enough for the mud to ever dry on the main floor.

Author:  Brian A [ Mon Nov 19, 2018 6:11 pm ]
Post subject:  Re: mk e's Shop remodel

mk e wrote:
Drywall finished on main floor. I didn't get any mud on though.....and I'm thinking as much as I want to do the mud and finish the main floor I probably need to move upstairs and get that sealed or it will not stay warm enough for the mud to ever dry on the main floor.
... or staple a piece of plastic across the opening to the attic and do it in spring.

What did you decide about the air supply plumbing?

Author:  mk e [ Mon Nov 19, 2018 6:32 pm ]
Post subject:  Re: mk e's Shop remodel

Brian A wrote:
... or staple a piece of plastic across the opening to the attic and do it in spring.

What did you decide about the air supply plumbing?


I can't....the compressor is up there. I decided to punt on the airline decision and run it outside to walls....but I'm leaning toward the rapid air stuff

Author:  mk e [ Wed Nov 21, 2018 10:49 am ]
Post subject:  Re: mk e's Shop remodel

My younger son walked into the shop for the first time in a while looking for me yesterday and stopped what he was saying and paused as his head turned back and forth a couple times in what looked like disbelief ...."this looks really nice!"... :)

I ran out of wood and didn't Lana's car to go get more as I moved on to the mud and was just finishing up a base coat when he walked in.

Hopefully over the long holiday weekend I'll get all the draywall finished....that might be a bit optimistic as upstairs is a bit complicated but I'm going to try hard. Exactly a year ago over the Thanksgiving weekend we out up the exterior walls.

Author:  kkrace [ Wed Nov 21, 2018 3:00 pm ]
Post subject:  Re: mk e's Shop remodel

I really like using the 90 minute Durock Joint compound that comes in a bag for the taping and first coat of mud. I only use it for the first coat because it does not sand easy but it hardens really hard and gives you a nice joint and doesn't shrink or crack while curing. It's completely cured by the next morning and ready for 2nd and 3rd coats. I use the standard stuff in the green topped bucket for the second and third coat.