Author: | mk e [ Mon Jan 07, 2019 11:29 am ] |
Post subject: | Re: mk e's Shop remodel |
Brian A wrote: mk e wrote: The big green thing is the welder, it has a 400A max ouptut and I think has a 100% duty cycle. Wow. In contrast, my little Lincoln 140HD does 140 amps ... at 20% duty cycle. I lied ....so I guess I'm qualified to be president! I just looked up my welder and its only 60% @300A The reason I looked it up is because I just learned something important about wiring welders...you get to use smaller wire than normal. There is a special section of the code (630.11) that gives you a multiplier based on the duty cycle to apply to the load the wire sees. So for me I take 112A x 0.78=87.4 and the 4g I'm using good and not even cheating. The breaker can be up to 200% the wire rating. I need to look a bit closer at my weld as it might have capacitors in it that drop the max draw to 86A which would let me run a 6g....who knew? |
Author: | mk e [ Mon Jan 07, 2019 3:50 pm ] |
Post subject: | Re: mk e's Shop remodel |
Found the owner's manual for my welder and it says 3g wite and a 150A time delay fuse......so I'm back to my wire being undersize, oh well.... |
Author: | Brian A [ Mon Jan 07, 2019 4:15 pm ] |
Post subject: | Re: mk e's Shop remodel |
mk e wrote: ... I guess I'm qualified to be president! Free welders for all; a V12 in every garage!
|
Author: | Brian A [ Sat Jan 12, 2019 10:54 am ] |
Post subject: | Re: mk e's Shop remodel |
mk e wrote: I mostly kind of got the shelves built tonight.....another hour or 2 then paint. Last night was lights in the kids hidden room. Slow but steady. Wow! The upstairs is looking really nice!
|
Author: | mk e [ Sat Jan 12, 2019 10:11 pm ] | ||
Post subject: | Re: mk e's Shop remodel | ||
Brian A wrote: mk e wrote: I mostly kind of got the shelves built tonight.....another hour or 2 then paint. Last night was lights in the kids hidden room. Slow but steady. Wow! The upstairs is looking really nice!Thanks....and I think except for some cleaning up it done....2 hours turned into all day but the shelves are built and have 2 coats of paint. I shouldn't be but I'm amazed at how much brighter the shop it now that everything is painted.....kind of wish I'd painted the old shop.
|
Author: | mk e [ Sun Jan 13, 2019 12:43 pm ] | ||
Post subject: | Re: mk e's Shop remodel | ||
I kind of figured the move was on borrowed time.....
|
Author: | mk e [ Sun Jan 13, 2019 6:21 pm ] | |||
Post subject: | Re: mk e's Shop remodel | |||
Small job this morning....the top of the stairs was missing a piece. It still needs paint but I glued it and want that dry before i cover it up.
|
Author: | mk e [ Mon Jan 21, 2019 8:34 am ] | ||
Post subject: | Re: mk e's Shop remodel | ||
While I thought the shop was done for now a the water heater I was blaming the no powder room on
|
Author: | mk e [ Mon Jan 21, 2019 8:35 am ] | ||||
Post subject: | Re: mk e's Shop remodel | ||||
So....
|