gemellocattivo.com
http://gemellocattivo.com/forum/

mk e's Shop remodel
http://gemellocattivo.com/forum/viewtopic.php?f=11&t=20
Page 49 of 54

Author:  mk e [ Fri Apr 05, 2019 5:29 pm ]
Post subject:  Re: mk e's Shop remodel

This took a ridiculous amount of time....but I like it now plus I emptied 3 draws in my tool box

Attachments:
20190405_172214-resized-1024.jpg
20190405_172214-resized-1024.jpg [ 257.07 KiB | Viewed 7241 times ]
20190405_172327-resized-1024.jpg
20190405_172327-resized-1024.jpg [ 212.94 KiB | Viewed 7241 times ]

Author:  mk e [ Sat Apr 06, 2019 8:42 am ]
Post subject:  Re: mk e's Shop remodel

And I made a nut for the sander....its been missing for like 20 years :oops:

But 60 cents for a nut and washer and now I have one.

Attachments:
20190406_074910-resized-1024.jpg
20190406_074910-resized-1024.jpg [ 375.95 KiB | Viewed 7234 times ]
20190406_074904-resized-1024.jpg
20190406_074904-resized-1024.jpg [ 309.71 KiB | Viewed 7234 times ]

Author:  mk e [ Mon Apr 08, 2019 1:27 pm ]
Post subject:  Re: mk e's Shop remodel

mk e wrote:
...so they are CNC.......hmmmm......yeah, so now I'm trying to negotiate them as a signing bonus :)


The offer showed up with no mention of CNCs....what the heck!

I fixed the belt sand I broke trying to sand the floor some months back...fried bearing, $7 for 2

Just bought a bunch of 30A 220V twist lock plugs to set up the MIG welded and an extension for it. I was sharing the 20A compressor plug but now its dedicated at the welding station I went to 30A thinking a plasma cutter might be in my future.

Then I need a work bench along the back....next day or 2. Then I should be ready to get into the engine.

Author:  mk e [ Tue Apr 09, 2019 9:30 pm ]
Post subject:  Re: mk e's Shop remodel

Not super exciting...but I went to install all the plugs o bought and realized I bought the 120V versions and had to exchange them all, but now it works and I can MIG anywhere in the shop.

Attachments:
20190409_103859-resized-1024.jpg
20190409_103859-resized-1024.jpg [ 224.62 KiB | Viewed 7186 times ]
20190409_120103-resized-1024.jpg
20190409_120103-resized-1024.jpg [ 341.39 KiB | Viewed 7186 times ]

Author:  mk e [ Mon Apr 15, 2019 7:30 pm ]
Post subject:  Re: mk e's Shop remodel

Started the new job today...I guess the mill and lathe are sold, they are sitting there, taunting me, but sold.

LOL

Author:  MerlinTech [ Tue Apr 16, 2019 6:24 am ]
Post subject:  Re: mk e's Shop remodel

Bastards, not fun.

Author:  mk e [ Tue Apr 23, 2019 10:28 am ]
Post subject:  Re: mk e's Shop remodel

Got a new bigger better toolbox on a company auction...its not a new fancy flow bench but still a nice upgrade

Attachments:
20190418_135818-resized-1024.jpg
20190418_135818-resized-1024.jpg [ 275.57 KiB | Viewed 7048 times ]
27763.jpeg
27763.jpeg [ 255.71 KiB | Viewed 7048 times ]

Author:  MerlinTech [ Tue Apr 23, 2019 6:02 pm ]
Post subject:  Re: mk e's Shop remodel

:D you have a flow bench and I have a nice tool box. Works out.

Author:  mk e [ Tue Apr 23, 2019 8:46 pm ]
Post subject:  Re: mk e's Shop remodel

I'm pretty happy with the new box....like new and $76

Attachments:
20190423_202520-resized-1024.jpg
20190423_202520-resized-1024.jpg [ 230.93 KiB | Viewed 7034 times ]

Author:  mk e [ Tue Apr 23, 2019 8:50 pm ]
Post subject:  Re: mk e's Shop remodel

And look at this pump will you! 500l/min and I think it's the 2 stage model that pulls down to 0.1 torr which is a crazy vacuum....mmmmmm....wheels :)

Attachments:
20190423_202554_001-resized-1024.jpg
20190423_202554_001-resized-1024.jpg [ 226.79 KiB | Viewed 7035 times ]
20190423_202607-resized-1024.jpg
20190423_202607-resized-1024.jpg [ 228.77 KiB | Viewed 7035 times ]

Page 49 of 54 All times are UTC - 5 hours [ DST ]
Powered by phpBB® Forum Software © phpBB Group
https://www.phpbb.com/