gemellocattivo.com http://gemellocattivo.com/forum/ |
|
mk e's Shop remodel http://gemellocattivo.com/forum/viewtopic.php?f=11&t=20 |
Page 49 of 54 |
Author: | mk e [ Sat Apr 06, 2019 8:42 am ] | |||
Post subject: | Re: mk e's Shop remodel | |||
And I made a nut for the sander....its been missing for like 20 years But 60 cents for a nut and washer and now I have one.
|
Author: | mk e [ Mon Apr 08, 2019 1:27 pm ] |
Post subject: | Re: mk e's Shop remodel |
mk e wrote: ...so they are CNC.......hmmmm......yeah, so now I'm trying to negotiate them as a signing bonus The offer showed up with no mention of CNCs....what the heck! I fixed the belt sand I broke trying to sand the floor some months back...fried bearing, $7 for 2 Just bought a bunch of 30A 220V twist lock plugs to set up the MIG welded and an extension for it. I was sharing the 20A compressor plug but now its dedicated at the welding station I went to 30A thinking a plasma cutter might be in my future. Then I need a work bench along the back....next day or 2. Then I should be ready to get into the engine. |
Author: | mk e [ Tue Apr 09, 2019 9:30 pm ] | |||
Post subject: | Re: mk e's Shop remodel | |||
Not super exciting...but I went to install all the plugs o bought and realized I bought the 120V versions and had to exchange them all, but now it works and I can MIG anywhere in the shop.
|
Author: | mk e [ Mon Apr 15, 2019 7:30 pm ] |
Post subject: | Re: mk e's Shop remodel |
Started the new job today...I guess the mill and lathe are sold, they are sitting there, taunting me, but sold. LOL |
Author: | MerlinTech [ Tue Apr 16, 2019 6:24 am ] |
Post subject: | Re: mk e's Shop remodel |
Bastards, not fun. |
Author: | mk e [ Tue Apr 23, 2019 10:28 am ] | |||
Post subject: | Re: mk e's Shop remodel | |||
Got a new bigger better toolbox on a company auction...its not a new fancy flow bench but still a nice upgrade
|
Author: | MerlinTech [ Tue Apr 23, 2019 6:02 pm ] |
Post subject: | Re: mk e's Shop remodel |
you have a flow bench and I have a nice tool box. Works out. |
Author: | mk e [ Tue Apr 23, 2019 8:46 pm ] | ||
Post subject: | Re: mk e's Shop remodel | ||
I'm pretty happy with the new box....like new and $76
|
Author: | mk e [ Tue Apr 23, 2019 8:50 pm ] | |||
Post subject: | Re: mk e's Shop remodel | |||
And look at this pump will you! 500l/min and I think it's the 2 stage model that pulls down to 0.1 torr which is a crazy vacuum....mmmmmm....wheels
|
Page 49 of 54 | All times are UTC - 5 hours [ DST ] |
Powered by phpBB® Forum Software © phpBB Group https://www.phpbb.com/ |